Industrial Wastewater Treatment Plant UF and Vacuum Evaporator System Installation and Assembly Works

Within the scope of Industrial Wastewater Treatment Plant UF and Vacuum Evaporator System Installation and Installation Works,

Ankara ORS A.Ş. We carried out and delivered the installation and stainless steel assembly works of the Vacuum Evaporator System, which was purchased by Ortadogu Rulman Sanayi A.Ş. from the German company H2O.

In addition, we are proud to carry out the installation and assembly works of the 2-module UltraFiltration (UF) system purchased from China in the same facility.

Industrial wastewater, which is very difficult to purify and has aggressive properties, is sent to the Vacuum Evaporator System after being pre-treated in the UltraFiltration Unit. Here, the concentration, chemical composition, temperature, etc. of the industrial waste liquid coming from the pre-treatment are evaluated. Depending on factors; 1 m3 of waste water is processed in the Vacuum Evaporator System (Batch) between 2 and 36 hours on average, and is purified from waste oils and sent to the Biological Purification Unit.

The obtained waste oil emulsions are appropriately given to the relevant companies to ensure that they are recycled into the economy.

To get more information and offers; please contact us at info@idealproses.com